FAS 270 Ch 19 over First Creek
GoodLaSalle County, Illinois · N 4250 E 315 · Structure no. 050359900000000
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected August 2024
- Type
- Culvert
- Concrete
- Length
- 40 ft
- 3 main spans
- Daily traffic
- 1,100
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 270 Ch 19 over First Creek is a concrete culvert carrying FAS 270 Ch 19 over First Creek in LaSalle County, Illinois. It was built in 2014, so it is 11 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,100 vehicles a day, roughly 5% of them trucks, projected to reach 1,111 by 2046. The structure is 40 ft (12.2 m) long. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 270 Ch 19 over First Creek built?
It was built in 2014, making it 11 years old in 2025.
What condition is FAS 270 Ch 19 over First Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does FAS 270 Ch 19 over First Creek carry?
About 1,100 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is FAS 270 Ch 19 over First Creek?
The structure is 40 ft (12.2 m) long with a longest span of 13 ft (3.9 m).
Who owns FAS 270 Ch 19 over First Creek?
It is owned by the County Highway Agency.