FAS 174/CH 9 over I-80 /Test RD Access
GoodLaSalle County, Illinois · 4.0 M E of Il 178 · Structure no. 050026100000000
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 225 ft
- 2 main spans
- Daily traffic
- 150
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
FAS 174/CH 9 over I-80 /Test RD Access is a steel continuous stringer/multi-beam or girder carrying FAS 174/CH 9 over I-80 /Test RD Access in LaSalle County, Illinois. It was built in 2021, so it is 4 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, roughly 8% of them trucks, projected to reach 152 by 2046. The structure is 225 ft (68.7 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 174/CH 9 over I-80 /Test RD Access built?
It was built in 2021, making it 4 years old in 2025.
What condition is FAS 174/CH 9 over I-80 /Test RD Access in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does FAS 174/CH 9 over I-80 /Test RD Access carry?
About 150 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is FAS 174/CH 9 over I-80 /Test RD Access?
The structure is 225 ft (68.7 m) long with a longest span of 118 ft (36.1 m) and a deck 31 ft wide.
Who owns FAS 174/CH 9 over I-80 /Test RD Access?
It is owned by the State Highway Agency.