I-39 Nb/Us 51 NB over Little Vermilion R.
FairLaSalle County, Illinois · 1.3 MI N of US 52 · Structure no. 050017000000000
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 143 ft
- 3 main spans
- Daily traffic
- 9,350
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-39 Nb/Us 51 NB over Little Vermilion R. is a prestressed concrete stringer/multi-beam or girder carrying I-39 Nb/Us 51 NB over Little Vermilion R. in LaSalle County, Illinois. It was built in 1979, so it is 46 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,350 vehicles a day, roughly 39% of them trucks, projected to reach 9,292 by 2046. The structure is 143 ft (43.6 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-39 Nb/Us 51 NB over Little Vermilion R. built?
It was built in 1979, making it 46 years old in 2025.
What condition is I-39 Nb/Us 51 NB over Little Vermilion R. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does I-39 Nb/Us 51 NB over Little Vermilion R. carry?
About 9,350 vehicles per day (2023 count), of which roughly 39% are trucks.
How long is I-39 Nb/Us 51 NB over Little Vermilion R.?
The structure is 143 ft (43.6 m) long with a longest span of 51 ft (15.6 m) and a deck 42 ft wide.
Who owns I-39 Nb/Us 51 NB over Little Vermilion R.?
It is owned by the State Highway Agency.