Sheridan Road over Mission Creek
GoodLaSalle County, Illinois · 0.7 MI N of US 52 · Structure no. 050009100000000
- Built
- 1930
- 95 years old, rebuilt 1987
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 56 ft
- 1 main span
- Daily traffic
- 1,700
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Sheridan Road over Mission Creek is a prestressed concrete stringer/multi-beam or girder carrying Sheridan Road over Mission Creek in LaSalle County, Illinois. It was built in 1930 and reconstructed in 1987, so it is 95 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,700 vehicles a day, roughly 6% of them trucks, projected to reach 1,717 by 2046. The structure is 56 ft (17.1 m) long and 34 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sheridan Road over Mission Creek built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1987.
What condition is Sheridan Road over Mission Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Sheridan Road over Mission Creek carry?
About 1,700 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is Sheridan Road over Mission Creek?
The structure is 56 ft (17.1 m) long with a longest span of 51 ft (15.5 m) and a deck 34 ft wide.
Who owns Sheridan Road over Mission Creek?
It is owned by the County Highway Agency.