Market St-Il 120RM over Unused Land
PoorLake County, Illinois · 200 Ft E Sheridan RD · Structure no. 049015100000000
- Built
- 1966
- 59 years old
- Condition
- Poor
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 832 ft
- 13 main spans
- Daily traffic
- 450
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Market St-Il 120RM over Unused Land is a prestressed concrete continuous stringer/multi-beam or girder carrying Market St-Il 120RM over Unused Land in Lake County, Illinois. It was built in 1966, so it is 59 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 450 vehicles a day, roughly 17% of them trucks, projected to reach 505 by 2046. The structure is 832 ft (253.6 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Market St-Il 120RM over Unused Land built?
It was built in 1966, making it 59 years old in 2025.
What condition is Market St-Il 120RM over Unused Land in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2023.
How much traffic does Market St-Il 120RM over Unused Land carry?
About 450 vehicles per day (2023 count), of which roughly 17% are trucks.
How long is Market St-Il 120RM over Unused Land?
The structure is 832 ft (253.6 m) long with a longest span of 64 ft (19.4 m) and a deck 37 ft wide.
Who owns Market St-Il 120RM over Unused Land?
It is owned by the City or Municipal Highway Agency.