Sheridan RD over Boyington Ravine
FairLake County, Illinois · Highland Park · Structure no. 049008100000000
- Built
- 1929
- 96 years old, rebuilt 2003
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 302 ft
- 5 main spans
- Daily traffic
- 2,500
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Sheridan RD over Boyington Ravine is a prestressed concrete continuous stringer/multi-beam or girder carrying Sheridan RD over Boyington Ravine in Lake County, Illinois. It was built in 1929 and reconstructed in 2003, so it is 96 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,500 vehicles a day, roughly 5% of them trucks, projected to reach 2,626 by 2046. The structure is 302 ft (92.1 m) long and 48 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sheridan RD over Boyington Ravine built?
It was built in 1929, making it 96 years old in 2025. It was reconstructed in 2003.
What condition is Sheridan RD over Boyington Ravine in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Sheridan RD over Boyington Ravine carry?
About 2,500 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Sheridan RD over Boyington Ravine?
The structure is 302 ft (92.1 m) long with a longest span of 67 ft (20.4 m) and a deck 48 ft wide.
Who owns Sheridan RD over Boyington Ravine?
It is owned by the State Highway Agency.