Il 131 (green Bay) over RR - Ej&e
FairLake County, Illinois · 1.1 M S of Il 137 · Structure no. 049001200000000
- Built
- 1954
- 71 years old, rebuilt 1984
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 145 ft
- 3 main spans
- Daily traffic
- 10,300
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Il 131 (green Bay) over RR - Ej&e is a steel continuous stringer/multi-beam or girder carrying Il 131 (green Bay) over RR - Ej&e in Lake County, Illinois. It was built in 1954 and reconstructed in 1984, so it is 71 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,300 vehicles a day, roughly 3% of them trucks, projected to reach 9,646 by 2046. The structure is 145 ft (44.2 m) long and 33 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Il 131 (green Bay) over RR - Ej&e built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1984.
What condition is Il 131 (green Bay) over RR - Ej&e in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Il 131 (green Bay) over RR - Ej&e carry?
About 10,300 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Il 131 (green Bay) over RR - Ej&e?
The structure is 145 ft (44.2 m) long with a longest span of 57 ft (17.4 m) and a deck 33 ft wide.
Who owns Il 131 (green Bay) over RR - Ej&e?
It is owned by the State Highway Agency.