Il 25 FAU 2503 over Waubansee Creek
FairKendall County, Illinois · 400 N of US 34 · Structure no. 047006200000000
- Built
- 2009
- 16 years old
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 106 ft
- 1 main span
- Daily traffic
- 7,900
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Il 25 FAU 2503 over Waubansee Creek is a prestressed concrete stringer/multi-beam or girder carrying Il 25 FAU 2503 over Waubansee Creek in Kendall County, Illinois. It was built in 2009, so it is 16 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,900 vehicles a day, roughly 3% of them trucks, projected to reach 8,726 by 2034. The structure is 106 ft (32.3 m) long and 51 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Il 25 FAU 2503 over Waubansee Creek built?
It was built in 2009, making it 16 years old in 2025.
What condition is Il 25 FAU 2503 over Waubansee Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Il 25 FAU 2503 over Waubansee Creek carry?
About 7,900 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Il 25 FAU 2503 over Waubansee Creek?
The structure is 106 ft (32.3 m) long with a longest span of 103 ft (31.4 m) and a deck 51 ft wide.
Who owns Il 25 FAU 2503 over Waubansee Creek?
It is owned by the State Highway Agency.