US Bridges

TR 3 over Forked Cr.

Good

Kankakee County, Illinois · 3.9 MI NE of Deselm · Structure no. 046340400000000

Built
1984
41 years old
Condition
Good
inspected April 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
35 ft
1 main span
Daily traffic
50
2021 count
Owner
County
County Highway Agency

About this bridge

TR 3 over Forked Cr. is a prestressed concrete box beam or girders - multiple carrying TR 3 over Forked Cr. in Kankakee County, Illinois. It was built in 1984, so it is 41 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 35 ft (10.7 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 3
CrossesForked Cr.
Location3.9 MI NE of Deselm
RouteCounty Highway 0
Coordinates41.29385, -87.92749
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.7 US tons
Inventory rating41.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length35 ft (10.7 m)
Longest span35 ft (10.7 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2021)
Projected traffic51 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 3 over Forked Cr. built?

It was built in 1984, making it 41 years old in 2025.

What condition is TR 3 over Forked Cr. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.

How much traffic does TR 3 over Forked Cr. carry?

About 50 vehicles per day (2021 count).

How long is TR 3 over Forked Cr.?

The structure is 35 ft (10.7 m) long with a longest span of 35 ft (10.7 m) and a deck 28 ft wide.

Who owns TR 3 over Forked Cr.?

It is owned by the County Highway Agency.