US Bridges

TR 119 over Lehigh Raymond Run

Good

Kankakee County, Illinois · 6.35 MI NE Herscher · Structure no. 046336600000000

Built
1980
45 years old
Condition
Good
inspected March 2024
Type
Channel Beam
Concrete
Length
34 ft
1 main span
Daily traffic
75
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 119 over Lehigh Raymond Run is a concrete channel beam carrying TR 119 over Lehigh Raymond Run in Kankakee County, Illinois. It was built in 1980, so it is 45 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, projected to reach 77 by 2046. The structure is 34 ft (10.4 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 119
CrossesLehigh Raymond Run
Location6.35 MI NE Herscher
RouteCounty Highway 0
Coordinates41.10242, -88.03075
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length34 ft (10.4 m)
Longest span32 ft (9.8 m)
Deck width27 ft (8.1 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2020)
Projected traffic77 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 119 over Lehigh Raymond Run built?

It was built in 1980, making it 45 years old in 2025.

What condition is TR 119 over Lehigh Raymond Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does TR 119 over Lehigh Raymond Run carry?

About 75 vehicles per day (2020 count).

How long is TR 119 over Lehigh Raymond Run?

The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m) and a deck 27 ft wide.

Who owns TR 119 over Lehigh Raymond Run?

It is owned by the Town or Township Highway Agency.