US Bridges

Wester Blvd over Creek

Good

Kane County, Illinois · 1.9 MI S of Higgins · Structure no. 045650100000000

Built
2005
20 years old
Condition
Good
inspected August 2023
Type
Arch - Deck
Concrete
Length
33 ft
1 main span
Daily traffic
3,050
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Wester Blvd over Creek is a concrete arch - deck carrying Wester Blvd over Creek in Kane County, Illinois. It was built in 2005, so it is 20 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,050 vehicles a day, roughly 2% of them trucks, projected to reach 3,843 by 2046. The structure is 33 ft (10.1 m) long and 57 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesWester Blvd
CrossesCreek
Location1.9 MI S of Higgins
RouteCity Street 0
Coordinates42.07836, -88.42454
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.3 US tons
Inventory rating35.7 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length33 ft (10.1 m)
Longest span32 ft (9.8 m)
Deck width57 ft (17.5 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,050 (2023)
Projected traffic3,843 by 2046
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Wester Blvd over Creek built?

It was built in 2005, making it 20 years old in 2025.

What condition is Wester Blvd over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Wester Blvd over Creek carry?

About 3,050 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is Wester Blvd over Creek?

The structure is 33 ft (10.1 m) long with a longest span of 32 ft (9.8 m) and a deck 57 ft wide.

Who owns Wester Blvd over Creek?

It is owned by the City or Municipal Highway Agency.