Granart Road (ch 3 over Big Rock Creek
GoodKane County, Illinois · 1.0 MI S Big Rock · Structure no. 045315100000000
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected March 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 143 ft
- 3 main spans
- Daily traffic
- 6,250
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Granart Road (ch 3 over Big Rock Creek is a prestressed concrete box beam or girders - multiple carrying Granart Road (ch 3 over Big Rock Creek in Kane County, Illinois. It was built in 2005, so it is 20 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,250 vehicles a day, roughly 6% of them trucks, projected to reach 7,137 by 2046. The structure is 143 ft (43.7 m) long and 54 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Granart Road (ch 3 over Big Rock Creek built?
It was built in 2005, making it 20 years old in 2025.
What condition is Granart Road (ch 3 over Big Rock Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.
How much traffic does Granart Road (ch 3 over Big Rock Creek carry?
About 6,250 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is Granart Road (ch 3 over Big Rock Creek?
The structure is 143 ft (43.7 m) long with a longest span of 47 ft (14.2 m) and a deck 54 ft wide.
Who owns Granart Road (ch 3 over Big Rock Creek?
It is owned by the County Highway Agency.