US Bridges

Il 64 over Drainage Ditch

Good

Kane County, Illinois · 0.1 E of Il 47 · Structure no. 045202700000000

Built
2012
13 years old
Condition
Good
inspected September 2022
Type
Culvert
Concrete Continuous
Length
22 ft
2 main spans
Daily traffic
4,900
2023 count
Owner
State
State Highway Agency

About this bridge

Il 64 over Drainage Ditch is a concrete continuous culvert carrying Il 64 over Drainage Ditch in Kane County, Illinois. It was built in 2012, so it is 13 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,900 vehicles a day, roughly 7% of them trucks, projected to reach 5,734 by 2046. The structure is 22 ft (6.6 m) long.

CarriesIl 64
CrossesDrainage Ditch
Location0.1 E of Il 47
RouteState Highway 64
Coordinates41.93932, -88.47782
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionSeptember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.9 US tons
Inventory rating41.8 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length22 ft (6.6 m)
Longest span10 ft (3.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,900 (2023)
Projected traffic5,734 by 2046
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Il 64 over Drainage Ditch built?

It was built in 2012, making it 13 years old in 2025.

What condition is Il 64 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2022.

How much traffic does Il 64 over Drainage Ditch carry?

About 4,900 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is Il 64 over Drainage Ditch?

The structure is 22 ft (6.6 m) long with a longest span of 10 ft (3.2 m).

Who owns Il 64 over Drainage Ditch?

It is owned by the State Highway Agency.