Wellington Rd-Tr 2 over Trib to Columbia Dit
GoodJohnson County, Illinois · W Edge Reevesville · Structure no. 044313100000000
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected May 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 100
- 2021 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Wellington Rd-Tr 2 over Trib to Columbia Dit is a prestressed concrete box beam or girders - multiple carrying Wellington Rd-Tr 2 over Trib to Columbia Dit in Johnson County, Illinois. It was built in 2007, so it is 18 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, roughly 20% of them trucks, projected to reach 105 by 2046. The structure is 47 ft (14.2 m) long and 24 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wellington Rd-Tr 2 over Trib to Columbia Dit built?
It was built in 2007, making it 18 years old in 2025.
What condition is Wellington Rd-Tr 2 over Trib to Columbia Dit in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.
How much traffic does Wellington Rd-Tr 2 over Trib to Columbia Dit carry?
About 100 vehicles per day (2021 count), of which roughly 20% are trucks.
How long is Wellington Rd-Tr 2 over Trib to Columbia Dit?
The structure is 47 ft (14.2 m) long with a longest span of 44 ft (13.4 m) and a deck 24 ft wide.
Who owns Wellington Rd-Tr 2 over Trib to Columbia Dit?
It is owned by the Town or Township Highway Agency.