FAS 927 over Trib to Cedar Creek
FairJohnson County, Illinois · 0.5 MI NW of Simpson · Structure no. 044310700000000
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected January 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 61 ft
- 1 main span
- Daily traffic
- 450
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 927 over Trib to Cedar Creek is a prestressed concrete box beam or girders - multiple carrying FAS 927 over Trib to Cedar Creek in Johnson County, Illinois. It was built in 1990, so it is 35 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 450 vehicles a day, roughly 11% of them trucks, projected to reach 473 by 2046. The structure is 61 ft (18.7 m) long and 28 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 927 over Trib to Cedar Creek built?
It was built in 1990, making it 35 years old in 2025.
What condition is FAS 927 over Trib to Cedar Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does FAS 927 over Trib to Cedar Creek carry?
About 450 vehicles per day (2021 count), of which roughly 11% are trucks.
How long is FAS 927 over Trib to Cedar Creek?
The structure is 61 ft (18.7 m) long with a longest span of 59 ft (17.9 m) and a deck 28 ft wide.
Who owns FAS 927 over Trib to Cedar Creek?
It is owned by the County Highway Agency.