US Bridges

Pump Station Road over Trib to Otter Creek

Good

Jersey County, Illinois · 3 M NW of Otterville · Structure no. 042313300000000

Built
1999
26 years old
Condition
Good
inspected April 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
62 ft
1 main span
Daily traffic
175
2022 count
Owner
County
County Highway Agency

About this bridge

Pump Station Road over Trib to Otter Creek is a prestressed concrete box beam or girders - multiple carrying Pump Station Road over Trib to Otter Creek in Jersey County, Illinois. It was built in 1999, so it is 26 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 175 vehicles a day, roughly 14% of them trucks, projected to reach 126 by 2046. The structure is 62 ft (18.9 m) long and 24 ft wide.

CarriesPump Station Road
CrossesTrib to Otter Creek
Location3 M NW of Otterville
RouteCounty Highway 0
Coordinates39.07763, -90.42978
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length62 ft (18.9 m)
Longest span59 ft (18.1 m)
Deck width24 ft (7.4 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic175 (2022)
Projected traffic126 by 2046
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pump Station Road over Trib to Otter Creek built?

It was built in 1999, making it 26 years old in 2025.

What condition is Pump Station Road over Trib to Otter Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Pump Station Road over Trib to Otter Creek carry?

About 175 vehicles per day (2022 count), of which roughly 14% are trucks.

How long is Pump Station Road over Trib to Otter Creek?

The structure is 62 ft (18.9 m) long with a longest span of 59 ft (18.1 m) and a deck 24 ft wide.

Who owns Pump Station Road over Trib to Otter Creek?

It is owned by the County Highway Agency.