TR-117 over Icg RR
PoorPosted for loadJefferson County, Illinois · 3.75 MI E Harmony · Structure no. 041990800000000
- Built
- 1960
- 65 years old
- Condition
- Poor
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 102 ft
- 5 main spans
- Daily traffic
- 75
- 2021 count
- Owner
- Railroad
- Railroad
About this bridge
TR-117 over Icg RR is a wood or timber stringer/multi-beam or girder carrying TR-117 over Icg RR in Jefferson County, Illinois. It was built in 1960, so it is 65 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 75 vehicles a day, roughly 9% of them trucks, projected to reach 76 by 2046. The structure is 102 ft (31.1 m) long and 20 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR-117 over Icg RR built?
It was built in 1960, making it 65 years old in 2025.
What condition is TR-117 over Icg RR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2025.
How much traffic does TR-117 over Icg RR carry?
About 75 vehicles per day (2021 count), of which roughly 9% are trucks.
How long is TR-117 over Icg RR?
The structure is 102 ft (31.1 m) long with a longest span of 22 ft (6.7 m) and a deck 20 ft wide.
Who owns TR-117 over Icg RR?
It is owned by the Railroad.