FAP-821 (ILL-15) over Seven Mile Creek
FairJefferson County, Illinois · 2 MI E Mt Vernon · Structure no. 041002700000000
- Built
- 1957
- 68 years old, rebuilt 2007
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 168 ft
- 3 main spans
- Daily traffic
- 4,600
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP-821 (ILL-15) over Seven Mile Creek is a steel continuous stringer/multi-beam or girder carrying FAP-821 (ILL-15) over Seven Mile Creek in Jefferson County, Illinois. It was built in 1957 and reconstructed in 2007, so it is 68 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,600 vehicles a day, roughly 9% of them trucks, projected to reach 4,242 by 2046. The structure is 168 ft (51.2 m) long and 44 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP-821 (ILL-15) over Seven Mile Creek built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 2007.
What condition is FAP-821 (ILL-15) over Seven Mile Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does FAP-821 (ILL-15) over Seven Mile Creek carry?
About 4,600 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is FAP-821 (ILL-15) over Seven Mile Creek?
The structure is 168 ft (51.2 m) long with a longest span of 61 ft (18.6 m) and a deck 44 ft wide.
Who owns FAP-821 (ILL-15) over Seven Mile Creek?
It is owned by the State Highway Agency.