US Bridges

TR 114 over W Wetweather Creek

Good

Jasper County, Illinois · 2 MI SE Bogota · Structure no. 040326600000000

Built
2013
12 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
43 ft
1 main span
Daily traffic
25
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 114 over W Wetweather Creek is a prestressed concrete box beam or girders - multiple carrying TR 114 over W Wetweather Creek in Jasper County, Illinois. It was built in 2013, so it is 12 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, roughly 8% of them trucks, projected to reach 26 by 2046. The structure is 43 ft (13 m) long and 24 ft wide.

CarriesTR 114
CrossesW Wetweather Creek
Location2 MI SE Bogota
RouteCounty Highway 0
Coordinates38.88869, -88.22512
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length43 ft (13 m)
Longest span43 ft (13 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2021)
Projected traffic26 by 2046
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 114 over W Wetweather Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is TR 114 over W Wetweather Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does TR 114 over W Wetweather Creek carry?

About 25 vehicles per day (2021 count), of which roughly 8% are trucks.

How long is TR 114 over W Wetweather Creek?

The structure is 43 ft (13 m) long with a longest span of 43 ft (13 m) and a deck 24 ft wide.

Who owns TR 114 over W Wetweather Creek?

It is owned by the Town or Township Highway Agency.