US Bridges

TR-298 over Creek

Good

Jasper County, Illinois · 0.6 MI Nnw Rafetown · Structure no. 040321500000000

Built
1994
31 years old
Condition
Good
inspected February 2021
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
61 ft
1 main span
Daily traffic
25
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR-298 over Creek is a prestressed concrete box beam or girders - multiple carrying TR-298 over Creek in Jasper County, Illinois. It was built in 1994, so it is 31 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, roughly 8% of them trucks, projected to reach 26 by 2046. The structure is 61 ft (18.7 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR-298
CrossesCreek
Location0.6 MI Nnw Rafetown
RouteCounty Highway 0
Coordinates38.86447, -88.00714
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length61 ft (18.7 m)
Longest span59 ft (17.9 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2021)
Projected traffic26 by 2046
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR-298 over Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is TR-298 over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2021.

How much traffic does TR-298 over Creek carry?

About 25 vehicles per day (2021 count), of which roughly 8% are trucks.

How long is TR-298 over Creek?

The structure is 61 ft (18.7 m) long with a longest span of 59 ft (17.9 m) and a deck 24 ft wide.

Who owns TR-298 over Creek?

It is owned by the Town or Township Highway Agency.