FAS-703 (CH-22) over Trib Hill Creek
GoodJasper County, Illinois · 0.5 MI N Gila · Structure no. 040317600000000
- Built
- 1983
- 42 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 58 ft
- 1 main span
- Daily traffic
- 150
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
FAS-703 (CH-22) over Trib Hill Creek is a prestressed concrete box beam or girders - multiple carrying FAS-703 (CH-22) over Trib Hill Creek in Jasper County, Illinois. It was built in 1983, so it is 42 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, roughly 6% of them trucks, projected to reach 153 by 2046. The structure is 58 ft (17.7 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS-703 (CH-22) over Trib Hill Creek built?
It was built in 1983, making it 42 years old in 2025.
What condition is FAS-703 (CH-22) over Trib Hill Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does FAS-703 (CH-22) over Trib Hill Creek carry?
About 150 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is FAS-703 (CH-22) over Trib Hill Creek?
The structure is 58 ft (17.7 m) long with a longest span of 56 ft (17.1 m) and a deck 28 ft wide.
Who owns FAS-703 (CH-22) over Trib Hill Creek?
It is owned by the County Highway Agency.