US Bridges

FAP-95(ILL 33) over W Fork Big Muddy

Fair

Jasper County, Illinois · .75 MI E Eff CO Line · Structure no. 040002100000000

Built
2012
13 years old
Condition
Fair
inspected July 2022
Type
Stringer/Multi-beam or Girder
Steel
Length
90 ft
1 main span
Daily traffic
5,900
2023 count
Owner
State
State Highway Agency

About this bridge

FAP-95(ILL 33) over W Fork Big Muddy is a steel stringer/multi-beam or girder carrying FAP-95(ILL 33) over W Fork Big Muddy in Jasper County, Illinois. It was built in 2012, so it is 13 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,900 vehicles a day, roughly 19% of them trucks, projected to reach 5,508 by 2046. The structure is 90 ft (27.5 m) long and 43 ft wide. If it were closed, the detour would be 42.9 mi (69 km).

CarriesFAP-95(ILL 33)
CrossesW Fork Big Muddy
Location.75 MI E Eff CO Line
RouteState Highway 33
Coordinates39.05274, -88.34782
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.8 US tons
Inventory rating55 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length90 ft (27.5 m)
Longest span88 ft (26.9 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,900 (2023)
Projected traffic5,508 by 2046
Trucks19%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed42.9 mi (69 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP-95(ILL 33) over W Fork Big Muddy built?

It was built in 2012, making it 13 years old in 2025.

What condition is FAP-95(ILL 33) over W Fork Big Muddy in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2022.

How much traffic does FAP-95(ILL 33) over W Fork Big Muddy carry?

About 5,900 vehicles per day (2023 count), of which roughly 19% are trucks.

How long is FAP-95(ILL 33) over W Fork Big Muddy?

The structure is 90 ft (27.5 m) long with a longest span of 88 ft (26.9 m) and a deck 43 ft wide.

Who owns FAP-95(ILL 33) over W Fork Big Muddy?

It is owned by the State Highway Agency.