US Bridges

FAS-919 (CH-12) over Drury Creek

Good

Jackson County, Illinois · 0.25MI SE Pleasant H · Structure no. 039326700000000

Built
2017
8 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
146 ft
3 main spans
Daily traffic
4,550
2022 count
Owner
County
County Highway Agency

About this bridge

FAS-919 (CH-12) over Drury Creek is a steel continuous stringer/multi-beam or girder carrying FAS-919 (CH-12) over Drury Creek in Jackson County, Illinois. It was built in 2017, so it is 8 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,550 vehicles a day, roughly 7% of them trucks, projected to reach 4,899 by 2046. The structure is 146 ft (44.4 m) long and 43 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFAS-919 (CH-12)
CrossesDrury Creek
Location0.25MI SE Pleasant H
RouteCounty Highway 0
Coordinates37.69807, -89.1816
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length146 ft (44.4 m)
Longest span53 ft (16.3 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,550 (2022)
Projected traffic4,899 by 2046
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAS-919 (CH-12) over Drury Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is FAS-919 (CH-12) over Drury Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does FAS-919 (CH-12) over Drury Creek carry?

About 4,550 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is FAS-919 (CH-12) over Drury Creek?

The structure is 146 ft (44.4 m) long with a longest span of 53 ft (16.3 m) and a deck 43 ft wide.

Who owns FAS-919 (CH-12) over Drury Creek?

It is owned by the County Highway Agency.