N Marion ST over Trib to Crab Orchard
GoodJackson County, Illinois · 1.21MI N of Fisher · Structure no. 039326400000000
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 500
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
N Marion ST over Trib to Crab Orchard is a prestressed concrete box beam or girders - multiple carrying N Marion ST over Trib to Crab Orchard in Jackson County, Illinois. It was built in 2010, so it is 15 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 500 vehicles a day, roughly 10% of them trucks, projected to reach 404 by 2046. The structure is 45 ft (13.6 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N Marion ST over Trib to Crab Orchard built?
It was built in 2010, making it 15 years old in 2025.
What condition is N Marion ST over Trib to Crab Orchard in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does N Marion ST over Trib to Crab Orchard carry?
About 500 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is N Marion ST over Trib to Crab Orchard?
The structure is 45 ft (13.6 m) long with a longest span of 42 ft (12.8 m) and a deck 30 ft wide.
Who owns N Marion ST over Trib to Crab Orchard?
It is owned by the County Highway Agency.