TR 312 Martie RD over Little Muddy Trib
GoodJackson County, Illinois · 0.65 MI N of Ch 18 · Structure no. 039323000000000
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 25 ft
- 1 main span
- Daily traffic
- 75
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 312 Martie RD over Little Muddy Trib is a prestressed concrete box beam or girders - multiple carrying TR 312 Martie RD over Little Muddy Trib in Jackson County, Illinois. It was built in 2003, so it is 22 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, roughly 1% of them trucks, projected to reach 126 by 2046. The structure is 25 ft (7.7 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 312 Martie RD over Little Muddy Trib built?
It was built in 2003, making it 22 years old in 2025.
What condition is TR 312 Martie RD over Little Muddy Trib in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does TR 312 Martie RD over Little Muddy Trib carry?
About 75 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is TR 312 Martie RD over Little Muddy Trib?
The structure is 25 ft (7.7 m) long with a longest span of 23 ft (7.1 m) and a deck 24 ft wide.
Who owns TR 312 Martie RD over Little Muddy Trib?
It is owned by the Town or Township Highway Agency.