TR 2 - Jaco Road over Trib to Little Muddy
GoodJackson County, Illinois · 250N000E · Structure no. 028334000000000
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected December 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 20
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 2 - Jaco Road over Trib to Little Muddy is a prestressed concrete box beam or girders - multiple carrying TR 2 - Jaco Road over Trib to Little Muddy in Jackson County, Illinois. It was built in 1996, so it is 29 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20 vehicles a day, roughly 30% of them trucks, projected to reach 25 by 2046. The structure is 52 ft (15.7 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 2 - Jaco Road over Trib to Little Muddy built?
It was built in 1996, making it 29 years old in 2025.
What condition is TR 2 - Jaco Road over Trib to Little Muddy in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.
How much traffic does TR 2 - Jaco Road over Trib to Little Muddy carry?
About 20 vehicles per day (2024 count), of which roughly 30% are trucks.
How long is TR 2 - Jaco Road over Trib to Little Muddy?
The structure is 52 ft (15.7 m) long with a longest span of 49 ft (14.9 m) and a deck 24 ft wide.
Who owns TR 2 - Jaco Road over Trib to Little Muddy?
It is owned by the Town or Township Highway Agency.