FAS 331 CH45 over Fountain Creek
FairIroquois County, Illinois · 0.6MI N Goodwine · Structure no. 038310600000000
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 132 ft
- 3 main spans
- Daily traffic
- 250
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 331 CH45 over Fountain Creek is a prestressed concrete box beam or girders - multiple carrying FAS 331 CH45 over Fountain Creek in Iroquois County, Illinois. It was built in 1982, so it is 43 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 250 vehicles a day, roughly 32% of them trucks, projected to reach 253 by 2046. The structure is 132 ft (40.2 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 331 CH45 over Fountain Creek built?
It was built in 1982, making it 43 years old in 2025.
What condition is FAS 331 CH45 over Fountain Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does FAS 331 CH45 over Fountain Creek carry?
About 250 vehicles per day (2022 count), of which roughly 32% are trucks.
How long is FAS 331 CH45 over Fountain Creek?
The structure is 132 ft (40.2 m) long with a longest span of 44 ft (13.4 m) and a deck 30 ft wide.
Who owns FAS 331 CH45 over Fountain Creek?
It is owned by the County Highway Agency.