Il 1/FAP 332A over Sugar Creek
FairIroquois County, Illinois · S Edge of Milford · Structure no. 038002500000000
- Built
- 1937
- 88 years old, rebuilt 1995
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 207 ft
- 4 main spans
- Daily traffic
- 2,200
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Il 1/FAP 332A over Sugar Creek is a prestressed concrete stringer/multi-beam or girder carrying Il 1/FAP 332A over Sugar Creek in Iroquois County, Illinois. It was built in 1937 and reconstructed in 1995, so it is 88 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,200 vehicles a day, roughly 15% of them trucks, projected to reach 2,879 by 2046. The structure is 207 ft (63.1 m) long and 36 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Il 1/FAP 332A over Sugar Creek built?
It was built in 1937, making it 88 years old in 2025. It was reconstructed in 1995.
What condition is Il 1/FAP 332A over Sugar Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Il 1/FAP 332A over Sugar Creek carry?
About 2,200 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is Il 1/FAP 332A over Sugar Creek?
The structure is 207 ft (63.1 m) long with a longest span of 55 ft (16.9 m) and a deck 36 ft wide.
Who owns Il 1/FAP 332A over Sugar Creek?
It is owned by the State Highway Agency.