Ch 2 / FAS 224 over Big Slough Ditch
GoodHenry County, Illinois · 3 Mi. NE Geneseo · Structure no. 037331200000000
- Built
- 1990
- 35 years old
- Condition
- Good
- inspected December 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 57 ft
- 1 main span
- Daily traffic
- 1,200
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Ch 2 / FAS 224 over Big Slough Ditch is a prestressed concrete box beam or girders - multiple carrying Ch 2 / FAS 224 over Big Slough Ditch in Henry County, Illinois. It was built in 1990, so it is 35 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,200 vehicles a day, roughly 10% of them trucks, projected to reach 1,296 by 2046. The structure is 57 ft (17.3 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 2 / FAS 224 over Big Slough Ditch built?
It was built in 1990, making it 35 years old in 2025.
What condition is Ch 2 / FAS 224 over Big Slough Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Ch 2 / FAS 224 over Big Slough Ditch carry?
About 1,200 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Ch 2 / FAS 224 over Big Slough Ditch?
The structure is 57 ft (17.3 m) long with a longest span of 54 ft (16.5 m) and a deck 36 ft wide.
Who owns Ch 2 / FAS 224 over Big Slough Ditch?
It is owned by the County Highway Agency.