TR 391(200 N) over Spooner Creek
GoodHenry County, Illinois · .3 MI E Bishop Hl RD · Structure no. 037330300000000
- Built
- 1988
- 37 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 36 ft
- 1 main span
- Daily traffic
- 150
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 391(200 N) over Spooner Creek is a prestressed concrete box beam or girders - multiple carrying TR 391(200 N) over Spooner Creek in Henry County, Illinois. It was built in 1988, so it is 37 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, roughly 29% of them trucks, projected to reach 162 by 2046. The structure is 36 ft (11.1 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 391(200 N) over Spooner Creek built?
It was built in 1988, making it 37 years old in 2025.
What condition is TR 391(200 N) over Spooner Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does TR 391(200 N) over Spooner Creek carry?
About 150 vehicles per day (2020 count), of which roughly 29% are trucks.
How long is TR 391(200 N) over Spooner Creek?
The structure is 36 ft (11.1 m) long with a longest span of 35 ft (10.7 m) and a deck 24 ft wide.
Who owns TR 391(200 N) over Spooner Creek?
It is owned by the Town or Township Highway Agency.