US Bridges

FAI 80 EB over FAP 638/IL 82

Fair

Henry County, Illinois · S Edge Geneseo · Structure no. 037016900000000

Built
2003
22 years old
Condition
Fair
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
206 ft
3 main spans
Daily traffic
10,300
2023 count
Owner
State
State Highway Agency

About this bridge

FAI 80 EB over FAP 638/IL 82 is a steel continuous stringer/multi-beam or girder carrying FAI 80 EB over FAP 638/IL 82 in Henry County, Illinois. It was built in 2003, so it is 22 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,300 vehicles a day, roughly 40% of them trucks, projected to reach 11,016 by 2046. The structure is 206 ft (62.9 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFAI 80 EB
CrossesFAP 638/IL 82
LocationS Edge Geneseo
RouteInterstate 80
Coordinates41.43039, -90.15784
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.5 US tons
Inventory rating44.3 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length206 ft (62.9 m)
Longest span96 ft (29.4 m)
Deck width50 ft (15.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deck17 ft (5.1 m)

Traffic and service

Average daily traffic10,300 (2023)
Projected traffic11,016 by 2046
Trucks40%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAI 80 EB over FAP 638/IL 82 built?

It was built in 2003, making it 22 years old in 2025.

What condition is FAI 80 EB over FAP 638/IL 82 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does FAI 80 EB over FAP 638/IL 82 carry?

About 10,300 vehicles per day (2023 count), of which roughly 40% are trucks.

How long is FAI 80 EB over FAP 638/IL 82?

The structure is 206 ft (62.9 m) long with a longest span of 96 ft (29.4 m) and a deck 50 ft wide.

Who owns FAI 80 EB over FAP 638/IL 82?

It is owned by the State Highway Agency.