FAI 80 SB over FAI 74
FairHenry County, Illinois · 3 MI SE Colona · Structure no. 037003100000000
- Built
- 1961
- 64 years old, rebuilt 1988
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 274 ft
- 4 main spans
- Daily traffic
- 10,750
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAI 80 SB over FAI 74 is a steel stringer/multi-beam or girder carrying FAI 80 SB over FAI 74 in Henry County, Illinois. It was built in 1961 and reconstructed in 1988, so it is 64 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,750 vehicles a day, roughly 41% of them trucks, projected to reach 11,718 by 2046. The structure is 274 ft (83.6 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAI 80 SB over FAI 74 built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1988.
What condition is FAI 80 SB over FAI 74 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does FAI 80 SB over FAI 74 carry?
About 10,750 vehicles per day (2023 count), of which roughly 41% are trucks.
How long is FAI 80 SB over FAI 74?
The structure is 274 ft (83.6 m) long with a longest span of 89 ft (27 m) and a deck 55 ft wide.
Who owns FAI 80 SB over FAI 74?
It is owned by the State Highway Agency.