FAI 80 SB over Cleveland RD/FAP595
PoorHenry County, Illinois · 2.1 M N JCT US 6 · Structure no. 037002300000000
- Built
- 1965
- 60 years old, rebuilt 1991
- Condition
- Poor
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 131 ft
- 3 main spans
- Daily traffic
- 10,800
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAI 80 SB over Cleveland RD/FAP595 is a steel continuous stringer/multi-beam or girder carrying FAI 80 SB over Cleveland RD/FAP595 in Henry County, Illinois. It was built in 1965 and reconstructed in 1991, so it is 60 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 10,800 vehicles a day, roughly 40% of them trucks, projected to reach 11,016 by 2046. The structure is 131 ft (40 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAI 80 SB over Cleveland RD/FAP595 built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1991.
What condition is FAI 80 SB over Cleveland RD/FAP595 in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2024.
How much traffic does FAI 80 SB over Cleveland RD/FAP595 carry?
About 10,800 vehicles per day (2023 count), of which roughly 40% are trucks.
How long is FAI 80 SB over Cleveland RD/FAP595?
The structure is 131 ft (40 m) long with a longest span of 45 ft (13.6 m) and a deck 53 ft wide.
Who owns FAI 80 SB over Cleveland RD/FAP595?
It is owned by the State Highway Agency.