FAS 1600 (ch 12) over Mallard Creek
GoodHancock County, Illinois · 5 MI S Warsaw · Structure no. 034312300000000
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 64 ft
- 1 main span
- Daily traffic
- 375
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 1600 (ch 12) over Mallard Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying FAS 1600 (ch 12) over Mallard Creek in Hancock County, Illinois. It was built in 2023, so it is 2 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 375 vehicles a day, roughly 8% of them trucks, projected to reach 379 by 2046. The structure is 64 ft (19.5 m) long and 30 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 1600 (ch 12) over Mallard Creek built?
It was built in 2023, making it 2 years old in 2025.
What condition is FAS 1600 (ch 12) over Mallard Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does FAS 1600 (ch 12) over Mallard Creek carry?
About 375 vehicles per day (2018 count), of which roughly 8% are trucks.
How long is FAS 1600 (ch 12) over Mallard Creek?
The structure is 64 ft (19.5 m) long with a longest span of 60 ft (18.3 m) and a deck 30 ft wide.
Who owns FAS 1600 (ch 12) over Mallard Creek?
It is owned by the County Highway Agency.