CR 1250 E over Swan Pond Lateral
GoodHamilton County, Illinois · 2.0 MI NE of Dale · Structure no. 033332700000000
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 49 ft
- 1 main span
- Daily traffic
- 25
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
CR 1250 E over Swan Pond Lateral is a prestressed concrete stringer/multi-beam or girder carrying CR 1250 E over Swan Pond Lateral in Hamilton County, Illinois. It was built in 2024, so it is 1 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25 vehicles a day, roughly 56% of them trucks, projected to reach 25 by 2046. The structure is 49 ft (15 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 1250 E over Swan Pond Lateral built?
It was built in 2024, making it 1 years old in 2025.
What condition is CR 1250 E over Swan Pond Lateral in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does CR 1250 E over Swan Pond Lateral carry?
About 25 vehicles per day (2022 count), of which roughly 56% are trucks.
How long is CR 1250 E over Swan Pond Lateral?
The structure is 49 ft (15 m) long with a longest span of 48 ft (14.5 m) and a deck 24 ft wide.
Who owns CR 1250 E over Swan Pond Lateral?
It is owned by the Town or Township Highway Agency.