US Bridges

TR-95 over Middle Creek

Good

Hamilton County, Illinois · 1 MI SW Dealfield · Structure no. 033325500000000

Built
1993
32 years old
Condition
Good
inspected May 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
52 ft
1 main span
Daily traffic
75
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR-95 over Middle Creek is a prestressed concrete box beam or girders - multiple carrying TR-95 over Middle Creek in Hamilton County, Illinois. It was built in 1993, so it is 32 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, roughly 13% of them trucks, projected to reach 101 by 2046. The structure is 52 ft (15.8 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR-95
CrossesMiddle Creek
Location1 MI SW Dealfield
RouteCounty Highway 0
Coordinates38.13745, -88.6251
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length52 ft (15.8 m)
Longest span49 ft (14.8 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2022)
Projected traffic101 by 2046
Trucks13%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR-95 over Middle Creek built?

It was built in 1993, making it 32 years old in 2025.

What condition is TR-95 over Middle Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does TR-95 over Middle Creek carry?

About 75 vehicles per day (2022 count), of which roughly 13% are trucks.

How long is TR-95 over Middle Creek?

The structure is 52 ft (15.8 m) long with a longest span of 49 ft (14.8 m) and a deck 24 ft wide.

Who owns TR-95 over Middle Creek?

It is owned by the Town or Township Highway Agency.