FAS-881 (CH-11) over N Fk Saline River
GoodHamilton County, Illinois · 2 MI E Broughton · Structure no. 033324700000000
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 137 ft
- 3 main spans
- Daily traffic
- 100
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
FAS-881 (CH-11) over N Fk Saline River is a prestressed concrete box beam or girders - multiple carrying FAS-881 (CH-11) over N Fk Saline River in Hamilton County, Illinois. It was built in 1989, so it is 36 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, roughly 38% of them trucks, projected to reach 76 by 2046. The structure is 137 ft (41.9 m) long and 28 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS-881 (CH-11) over N Fk Saline River built?
It was built in 1989, making it 36 years old in 2025.
What condition is FAS-881 (CH-11) over N Fk Saline River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does FAS-881 (CH-11) over N Fk Saline River carry?
About 100 vehicles per day (2022 count), of which roughly 38% are trucks.
How long is FAS-881 (CH-11) over N Fk Saline River?
The structure is 137 ft (41.9 m) long with a longest span of 54 ft (16.5 m) and a deck 28 ft wide.
Who owns FAS-881 (CH-11) over N Fk Saline River?
It is owned by the County Highway Agency.