CH41 (grandridge R over Murray Slough
GoodGrundy County, Illinois · 0.03 MI W of TR 128 · Structure no. 032322100000000
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 93 ft
- 3 main spans
- Daily traffic
- 625
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
CH41 (grandridge R over Murray Slough is a prestressed concrete box beam or girders - multiple carrying CH41 (grandridge R over Murray Slough in Grundy County, Illinois. It was built in 2022, so it is 3 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 625 vehicles a day, roughly 22% of them trucks, projected to reach 1,138 by 2032. The structure is 93 ft (28.3 m) long and 27 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CH41 (grandridge R over Murray Slough built?
It was built in 2022, making it 3 years old in 2025.
What condition is CH41 (grandridge R over Murray Slough in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does CH41 (grandridge R over Murray Slough carry?
About 625 vehicles per day (2024 count), of which roughly 22% are trucks.
How long is CH41 (grandridge R over Murray Slough?
The structure is 93 ft (28.3 m) long with a longest span of 39 ft (12 m) and a deck 27 ft wide.
Who owns CH41 (grandridge R over Murray Slough?
It is owned by the County Highway Agency.