US Bridges

TR-248 over Birch Creek

Fair

Greene County, Illinois · 3 MI SE Roodhouse · Structure no. 031504800000000

Built
1982
43 years old
Condition
Fair
inspected January 2023
Type
Channel Beam
Concrete
Length
100 ft
3 main spans
Daily traffic
75
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR-248 over Birch Creek is a concrete channel beam carrying TR-248 over Birch Creek in Greene County, Illinois. It was built in 1982, so it is 43 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 75 vehicles a day, roughly 19% of them trucks, projected to reach 76 by 2046. The structure is 100 ft (30.5 m) long and 26 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesTR-248
CrossesBirch Creek
Location3 MI SE Roodhouse
RouteCounty Highway 0
Coordinates39.46442, -90.28821
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating56.4 US tons
Inventory rating34 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadH 20
Structure length100 ft (30.5 m)
Longest span38 ft (11.6 m)
Deck width26 ft (8 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2022)
Projected traffic76 by 2046
Trucks19%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR-248 over Birch Creek built?

It was built in 1982, making it 43 years old in 2025.

What condition is TR-248 over Birch Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.

How much traffic does TR-248 over Birch Creek carry?

About 75 vehicles per day (2022 count), of which roughly 19% are trucks.

How long is TR-248 over Birch Creek?

The structure is 100 ft (30.5 m) long with a longest span of 38 ft (11.6 m) and a deck 26 ft wide.

Who owns TR-248 over Birch Creek?

It is owned by the Town or Township Highway Agency.