US Bridges

TR 158 over Crawford CR

Good

Gallatin County, Illinois · 2.1 MI N FAS 889 · Structure no. 030308200000000

Built
1985
40 years old
Condition
Good
inspected November 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
39 ft
1 main span
Daily traffic
25
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 158 over Crawford CR is a prestressed concrete box beam or girders - multiple carrying TR 158 over Crawford CR in Gallatin County, Illinois. It was built in 1985, so it is 40 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, roughly 80% of them trucks, projected to reach 25 by 2046. The structure is 39 ft (11.9 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR 158
CrossesCrawford CR
Location2.1 MI N FAS 889
RouteCounty Highway 0
Coordinates37.82378, -88.21067
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length39 ft (11.9 m)
Longest span37 ft (11.3 m)
Deck width24 ft (7.4 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2023)
Projected traffic25 by 2046
Trucks80%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 158 over Crawford CR built?

It was built in 1985, making it 40 years old in 2025.

What condition is TR 158 over Crawford CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does TR 158 over Crawford CR carry?

About 25 vehicles per day (2023 count), of which roughly 80% are trucks.

How long is TR 158 over Crawford CR?

The structure is 39 ft (11.9 m) long with a longest span of 37 ft (11.3 m) and a deck 24 ft wide.

Who owns TR 158 over Crawford CR?

It is owned by the Town or Township Highway Agency.