New Bridge RD-TR21 over Big CR
FairFulton County, Illinois · NW-9-T6NR4E · Structure no. 029418900000000
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 80 ft
- 1 main span
- Daily traffic
- 50
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
New Bridge RD-TR21 over Big CR is a prestressed concrete box beam or girders - multiple carrying New Bridge RD-TR21 over Big CR in Fulton County, Illinois. It was built in 1986, so it is 39 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 80 ft (24.4 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was New Bridge RD-TR21 over Big CR built?
It was built in 1986, making it 39 years old in 2025.
What condition is New Bridge RD-TR21 over Big CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does New Bridge RD-TR21 over Big CR carry?
About 50 vehicles per day (2020 count).
How long is New Bridge RD-TR21 over Big CR?
The structure is 80 ft (24.4 m) long with a longest span of 77 ft (23.5 m) and a deck 24 ft wide.
Who owns New Bridge RD-TR21 over Big CR?
It is owned by the Town or Township Highway Agency.