Chockley RD - TR33 over Stuart Creek
FairFulton County, Illinois · E1/2-2-T5NR2E · Structure no. 029412500000000
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 10
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Chockley RD - TR33 over Stuart Creek is a prestressed concrete box beam or girders - multiple carrying Chockley RD - TR33 over Stuart Creek in Fulton County, Illinois. It was built in 1986, so it is 39 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10 vehicles a day, projected to reach 10 by 2046. The structure is 62 ft (18.9 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Chockley RD - TR33 over Stuart Creek built?
It was built in 1986, making it 39 years old in 2025.
What condition is Chockley RD - TR33 over Stuart Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Chockley RD - TR33 over Stuart Creek carry?
About 10 vehicles per day (2020 count).
How long is Chockley RD - TR33 over Stuart Creek?
The structure is 62 ft (18.9 m) long with a longest span of 59 ft (18 m) and a deck 24 ft wide.
Who owns Chockley RD - TR33 over Stuart Creek?
It is owned by the Town or Township Highway Agency.