Cameron RD - TR 21 over Put Creek
FairFulton County, Illinois · NE-10-T6NR2E · Structure no. 029410400000000
- Built
- 1997
- 28 years old
- Condition
- Fair
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 72 ft
- 1 main span
- Daily traffic
- 10
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Cameron RD - TR 21 over Put Creek is a prestressed concrete box beam or girders - multiple carrying Cameron RD - TR 21 over Put Creek in Fulton County, Illinois. It was built in 1997, so it is 28 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10 vehicles a day, projected to reach 10 by 2046. The structure is 72 ft (21.8 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cameron RD - TR 21 over Put Creek built?
It was built in 1997, making it 28 years old in 2025.
What condition is Cameron RD - TR 21 over Put Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Cameron RD - TR 21 over Put Creek carry?
About 10 vehicles per day (2020 count).
How long is Cameron RD - TR 21 over Put Creek?
The structure is 72 ft (21.8 m) long with a longest span of 70 ft (21.3 m) and a deck 24 ft wide.
Who owns Cameron RD - TR 21 over Put Creek?
It is owned by the Town or Township Highway Agency.