Roberts RD - TR 61 over Gallet Creek
FairFulton County, Illinois · NE-29-T8NR1E · Structure no. 029405300000000
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 61 ft
- 1 main span
- Daily traffic
- 75
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Roberts RD - TR 61 over Gallet Creek is a prestressed concrete box beam or girders - multiple carrying Roberts RD - TR 61 over Gallet Creek in Fulton County, Illinois. It was built in 1999, so it is 26 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 75 vehicles a day, projected to reach 76 by 2046. The structure is 61 ft (18.7 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Roberts RD - TR 61 over Gallet Creek built?
It was built in 1999, making it 26 years old in 2025.
What condition is Roberts RD - TR 61 over Gallet Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Roberts RD - TR 61 over Gallet Creek carry?
About 75 vehicles per day (2020 count).
How long is Roberts RD - TR 61 over Gallet Creek?
The structure is 61 ft (18.7 m) long with a longest span of 59 ft (18 m) and a deck 24 ft wide.
Who owns Roberts RD - TR 61 over Gallet Creek?
It is owned by the Town or Township Highway Agency.