TR 2 over S Br Barker CR
PoorPosted for loadFulton County, Illinois · SW-7-T5NR1E · Structure no. 029304300000000
- Built
- 1960
- 65 years old
- Condition
- Poor
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 35 ft
- 1 main span
- Daily traffic
- 10
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 2 over S Br Barker CR is a steel stringer/multi-beam or girder carrying TR 2 over S Br Barker CR in Fulton County, Illinois. It was built in 1960, so it is 65 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 10 vehicles a day, projected to reach 10 by 2046. The structure is 35 ft (10.7 m) long and 21 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 2 over S Br Barker CR built?
It was built in 1960, making it 65 years old in 2025.
What condition is TR 2 over S Br Barker CR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2023.
How much traffic does TR 2 over S Br Barker CR carry?
About 10 vehicles per day (2020 count).
How long is TR 2 over S Br Barker CR?
The structure is 35 ft (10.7 m) long with a longest span of 33 ft (10.1 m) and a deck 21 ft wide.
Who owns TR 2 over S Br Barker CR?
It is owned by the Town or Township Highway Agency.