Ill 95 over Spoon River
FairFulton County, Illinois · 2 MI W Smithfield · Structure no. 029002500000000
- Built
- 1932
- 93 years old, rebuilt 1984
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 509 ft
- 9 main spans
- Daily traffic
- 1,400
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Ill 95 over Spoon River is a steel continuous stringer/multi-beam or girder carrying Ill 95 over Spoon River in Fulton County, Illinois. It was built in 1932 and reconstructed in 1984, so it is 93 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,400 vehicles a day, roughly 6% of them trucks, projected to reach 1,515 by 2046. The structure is 509 ft (155.1 m) long and 35 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ill 95 over Spoon River built?
It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1984.
What condition is Ill 95 over Spoon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Ill 95 over Spoon River carry?
About 1,400 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is Ill 95 over Spoon River?
The structure is 509 ft (155.1 m) long with a longest span of 89 ft (27.1 m) and a deck 35 ft wide.
Who owns Ill 95 over Spoon River?
It is owned by the State Highway Agency.