E Taylor Street over Trib of Big Muddy Rv
GoodFranklin County, Illinois · Mirror Lake Subdvsn · Structure no. 028600400000000
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected June 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 150
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
E Taylor Street over Trib of Big Muddy Rv is a prestressed concrete box beam or girders - multiple carrying E Taylor Street over Trib of Big Muddy Rv in Franklin County, Illinois. It was built in 1997, so it is 28 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, roughly 15% of them trucks, projected to reach 202 by 2046. The structure is 52 ft (15.8 m) long and 29 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E Taylor Street over Trib of Big Muddy Rv built?
It was built in 1997, making it 28 years old in 2025.
What condition is E Taylor Street over Trib of Big Muddy Rv in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.
How much traffic does E Taylor Street over Trib of Big Muddy Rv carry?
About 150 vehicles per day (2024 count), of which roughly 15% are trucks.
How long is E Taylor Street over Trib of Big Muddy Rv?
The structure is 52 ft (15.8 m) long with a longest span of 49 ft (15 m) and a deck 29 ft wide.
Who owns E Taylor Street over Trib of Big Muddy Rv?
It is owned by the City or Municipal Highway Agency.