Baseline RD over Trib to Ewing Creek
GoodFranklin County, Illinois · .5 MI S Four Mile LN · Structure no. 028340200000000
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected June 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 31 ft
- 1 main span
- Daily traffic
- 200
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Baseline RD over Trib to Ewing Creek is a prestressed concrete box beam or girders - multiple carrying Baseline RD over Trib to Ewing Creek in Franklin County, Illinois. It was built in 2008, so it is 17 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 200 vehicles a day, roughly 28% of them trucks, projected to reach 253 by 2046. The structure is 31 ft (9.6 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Baseline RD over Trib to Ewing Creek built?
It was built in 2008, making it 17 years old in 2025.
What condition is Baseline RD over Trib to Ewing Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.
How much traffic does Baseline RD over Trib to Ewing Creek carry?
About 200 vehicles per day (2024 count), of which roughly 28% are trucks.
How long is Baseline RD over Trib to Ewing Creek?
The structure is 31 ft (9.6 m) long with a longest span of 29 ft (8.8 m) and a deck 24 ft wide.
Who owns Baseline RD over Trib to Ewing Creek?
It is owned by the Town or Township Highway Agency.