TR12 Square Deal R over Fox Lake Trib
GoodFranklin County, Illinois · 5 MI S of Ill 14 · Structure no. 028337900000000
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 27 ft
- 1 main span
- Daily traffic
- 20
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR12 Square Deal R over Fox Lake Trib is a prestressed concrete box beam or girders - multiple carrying TR12 Square Deal R over Fox Lake Trib in Franklin County, Illinois. It was built in 2004, so it is 21 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20 vehicles a day, roughly 10% of them trucks, projected to reach 25 by 2046. The structure is 27 ft (8.2 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR12 Square Deal R over Fox Lake Trib built?
It was built in 2004, making it 21 years old in 2025.
What condition is TR12 Square Deal R over Fox Lake Trib in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does TR12 Square Deal R over Fox Lake Trib carry?
About 20 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is TR12 Square Deal R over Fox Lake Trib?
The structure is 27 ft (8.2 m) long with a longest span of 24 ft (7.3 m) and a deck 24 ft wide.
Who owns TR12 Square Deal R over Fox Lake Trib?
It is owned by the Town or Township Highway Agency.