US Bridges

TR 35 Brenton over Stream

Good

Ford County, Illinois · 1360E 2450N · Structure no. 027344500000000

Built
2009
16 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete Continuous
Length
67 ft
3 main spans
Daily traffic
75
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 35 Brenton over Stream is a concrete continuous slab carrying TR 35 Brenton over Stream in Ford County, Illinois. It was built in 2009, so it is 16 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, projected to reach 76 by 2046. The structure is 67 ft (20.4 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 35 Brenton
CrossesStream
Location1360E 2450N
RouteCounty Highway 0
Coordinates40.75516, -88.20961
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length67 ft (20.4 m)
Longest span24 ft (7.3 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2023)
Projected traffic76 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 35 Brenton over Stream built?

It was built in 2009, making it 16 years old in 2025.

What condition is TR 35 Brenton over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does TR 35 Brenton over Stream carry?

About 75 vehicles per day (2023 count).

How long is TR 35 Brenton over Stream?

The structure is 67 ft (20.4 m) long with a longest span of 24 ft (7.3 m) and a deck 28 ft wide.

Who owns TR 35 Brenton over Stream?

It is owned by the Town or Township Highway Agency.